03 Sep 2019

Roof planting module installation process

0 Comment
  1. The roof or ground where the green planting module is to be placed is leveled, and if necessary, the bottom layer is treated with water;
  2. Start the two or two modules along the starting point, the water pipes between the modules are connected well, and the water pipes and the modules must be fastened;
  3. Place a filter plate and geotextile on each module, and the geotextile should cover the entire filter plate;
  4. Place the soil and smooth it, the soil does not exceed the border of the module;
  5. Planting plants such as flowers and plants, watering them, and trying not to exceed the module’s ability to store water;
  6. Usually watered according to the weather conditions.

Note:

– Check that each module is complete and defect free before installation;
– The surrounding modules should be sealed with a plug.

Roof planting module installation process
Roof planting module installation process

[top]

INQUIRY NOW

We always looking forward to hearing from you!
Get in touch and we’ll get back to you as soon asap.

Please enable JavaScript in your browser to complete this form.